Scorecard View from a Timeline Chart

From Explore Analytics: The Wiki
Revision as of 20:16, 17 February 2015 by Gadiyedwab (talk | contribs) (Created page with "==Introduction== A timeline chart can feed both the main indicator and the trend (sparkline) indicator of a scorecard view. The latest value of the timeline is displayed as t...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Introduction

A timeline chart can feed both the main indicator and the trend (sparkline) indicator of a scorecard view. The latest value of the timeline is displayed as the main indicator and the entire timeline provides the trend.

An Example

In this example, we have a timeline view showing weekly sales.

Weekly sales.png

To convert it to a scorecard view, simply select the option from the file menu.

Scorecard from chart.png

The resulting scorecard is shown below.

Scorecard from chart2.png

All the information in this scorecard is taken from the timeline view. The main indicator is showing the current week's sales. The sparkline is showing the timeline. The secondary indicator and the up/down indicator are based on the percent change between the last point in the timeline (this week's sales) and the previous point in the timeline (last week's sales). In other words, the last two points in the timeline are used to calculate the change.

Important Note

When you create a scorecard from a view, a copy of this view becomes part of the scorecard. Subsequent changes to that view do not affect the scorecard. To make changes to the scorecard you’ll need to edit the scorecard's own copy of the view (called an input view).