Calculated Fields
Revision as of 12:15, 31 August 2015 by Gadiyedwab (talk | contribs) (Created page with "== Introduction == A calculated field is calculated from other fields in the list. The calculated field itself does not exist in the data source. Its value for each row is ca...")
Introduction
A calculated field is calculated from other fields in the list. The calculated field itself does not exist in the data source. Its value for each row is calculated from the values of the other fields.
The calculated value does not have to be numeric. In fact you can calculate a date, a time duration, or perform some text manipulation to create the value.